Subaru Forester

1997-2005 of release

Repair and car operation



Subaru Forester
+ Cars Subaru Forester
+ The maintenance instruction
+ Routine maintenance
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
+ Engine electric equipment
+ Control systems of the engine
- Gear change box
   - 5-step manual box of a gear change (РКПП)
      The general information
      Removal and installation of a box of a gear change
      Preparation for performance of repair work on restoration РКПП
      Dismantling and assemblage of a distributing box, service of components
      Major repairs РКПП of all-wheel drive models
      Service of a drive of a gear change
      Service of the lever of switching of a distributing box
   + 4-step automatic transmission (АТ)
+ Coupling, трансмиссионная a line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


3df4be34

Removal and installation of a box of a gear change

Removal

The connection scheme to РКПП draughts of the mechanism of a gear change

1  —  Draught
2  —  Connecting draught
3  — the  Spring

 


Removal of a collar of fastening of a bar of the stabilizer of cross-section stability to the cross-section lever

1  — a  stabilizer Bar
2  — the  Cross-section lever

 


If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for audiosystem input in action!


 PERFORMANCE ORDER

1. Open a cover of a cowl and fix it in open position.
2. Disconnect a negative wire from the battery.
3. On the models equipped with a turbo-supercharging, remove assemblage of an intermediate cooler (see the Head of the Power supply system and release).
4. Remove corresponding elements of system of an admission of air.
5. Disconnect the forward oxygen gauge, the tyre of grounding of transmission and other disturbing to performance of works electroconducting. Disconnect electroconducting from the gauge-switch of neutral position РКПП, the gauge-switch of fires of a backing and VSS. At a corresponding complete set of the car disconnect cables of a drive of coupling and system of keeping of the car on a bias.
    1  —  Draught
    2  —  Connecting draught
    3  — the  Spring
6. Remove the executive cylinder of coupling.
7. Remove торсионную a bar established between the power unit and a body of the car.
8. Remove a starter.
9. On models with a turbo-supercharging separate a plug of deenergizing of coupling from выжимного the bearing.
10. Hang out the engine by means of special established on a body of the car of a beam (927670000). Поддомкратьте the car also establish it on props. Remove forward and back sections of system of release of the fulfilled gases. Remove a thermofilter of system of release.
11. At a corresponding complete set remove a beam of a forward suspension bracket. Remove карданный a shaft, preliminary having marked its adjusting position. Remove the central bearing карданного a shaft.
12. Закупорьте an aperture in back walls of a casing of lengthening of transmission. Disconnect a rod of a choice of transfers from рейки transmissions.
13. Remove an arm of a support of a suspension bracket of transmission. Disconnect from a transmission of draught of the mechanism of switching.
14. By means of approaching выколотки beat out cylindrical pins of fastening of both power shafts. Disconnect a bar of the stabilizer of cross-section stability from the cross-section lever. Liberate from clamps on the lever a cable of a drive of a lay brake. Turn out a bolt of fastening of the cross-section lever to a beam of a forward suspension bracket, then liberate power shafts from transmission.
15. Release bolts/nuts of fastening of a transmission to the engine, then prop up transmission тележечным a jack. Give nuts of pillows of a back support and remove a back beam of a suspension bracket.
16. Separate transmission from the engine and take it from under the car.
17. Remove with трансмиссионной assemblages the lever of deenergizing and выжимной the coupling bearing, also remove the holder of the bearing.

Installation

Installation is made upside-down, - Coupling, трансмиссионная a line see also the Head. Do not forget to replace cylindrical pins of fastening of power shafts. All fixture tighten with demanded effort.