Subaru Forester

1997-2005 of release

Repair and car operation



Subaru Forester
+ Cars Subaru Forester
+ The maintenance instruction
+ Routine maintenance
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
+ Engine electric equipment
+ Control systems of the engine
- Gear change box
   - 5-step manual box of a gear change (РКПП)
      The general information
      Removal and installation of a box of a gear change
      Preparation for performance of repair work on restoration РКПП
      Dismantling and assemblage of a distributing box, service of components
      Major repairs РКПП of all-wheel drive models
      Service of a drive of a gear change
      Service of the lever of switching of a distributing box
   + 4-step automatic transmission (АТ)
+ Coupling, трансмиссионная a line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


3df4be34

Service of a drive of a gear change

Removal of levers of switching РКПП

Removal of panels of furnish of the central console

1  — the  Button
2  — the  Cover
3  — the  Panel of furnish of the console

 


 PERFORMANCE ORDER

1. Remove the handle of the lever of switching of a distributing box (двухрядная a box). Remove the lever.
2. Remove forward and back sections of the central console.
3. Disconnect electroconducting of the gauge-switch of a control lamp of activation of an all-wheel drive mode (model with a disconnected drive of back wheels).
4. Remove from the lever the handle and a protective cover.
5. Turn out fixing screws and remove the basis of a protective cover of the lever.
6. Remove a returnable spring from the hinge and the carburettor of the mechanism of a gear change.
7. Disconnect from an arm of switching a rack.
8. Disconnect from the hinge приводную draught.
9. Take from the case a rubber pillow.
10. Remove the gear change lever.

Dismantling

Order of removal of components of lever assemblage

1  — the  Fixing wire
2  — the  Protective cover
3  — the  Lock ring
4  — the  Sealing ring
5  — the  Plug
6  — the  lever Plug
7  — the  Pin

 


Removal of components from a rack of the lever of switching

1  — the  Prorate
2  — the  Plug
3  — the  Rubber pillow

 


 PERFORMANCE ORDER

1. Remove from a switching rack a rubber pillow.
2. Turn out from the lever a bolt of fastening of returnable draught.
3. Remove fixing wire.
4. Remove draught from the lever.
5. Remove duster.
6. Remove a lock ring.
7. Separate the lever of switching from a rack.
8. Remove duster the lever.
9. Operating in an order specified on an accompanying illustration, remove components of lever assemblage.
10. Remove from a rack of the lever the prorate, the plug and a rubber pillow.

Check

Attentively check up a condition of all components of lever assemblage (the plug, a pillow, the prorate, a cover, draughts, the lever, springs). The worn out and damaged details replace.

Assemblage

Installation of the lever of switching on a rack

1  — the  Rack
2  — the  Lock ring
3  — the  Plug
4  — the  Lever
5  — the  Protective cover
6  — the  Sealing ring

 


 PERFORMANCE ORDER

1. Carefully wash out all details.
2. Establish on a lever rack a rubber pillow, the plug and the prorate.
3. Establish on the lever a protective cover, the lock ring, a new sealing ring, the plug, the plug of the lever and a pin.

Before installation it is necessary to grease an internal surface of the plug консистентной with greasing of type SUNLIGHT №2.

4. Establish the switching lever on a rack.
5. Establish a rack a lock ring.
6. Fix a cover on the lever a wire clamp.
7. Pass in an aperture of a cover draught.
8. Connect bent for to the switching lever. Tighten fixture with demanded effort (9 15 Nanometers).
9. Establish on draught the plug and the prorate, preliminary having greased them консистентной with greasing of type SUNLIGHT №2.

Connection of bent for to the switching lever

Draught is established according to an illustration.


Installation

 PERFORMANCE ORDER

1. Translate the lever in neutral position.
2. Establish the lever in car salon.
3. Establish a protective cover and screw on the lever the handle.
4. At a corresponding complete set connect electroconducting to the gauge-switch of activation of a full drive.
5. Establish the panel of furnish of the central console.
6. Screw the handle on the lever of switching of a distributing box.
7. Plant in the case a rubber pillow. Tighten fixture with demanded effort (9 15 Nanometers).
8. Connect bent for to the switching hinge, - tighten fixture with demanded effort (9 15 Nanometers).
9. Connect a rack to an arm.