Subaru Forester

1997-2005 of release

Repair and car operation



Subaru Forester
+ Cars Subaru Forester
+ The maintenance instruction
+ Routine maintenance
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
+ Engine electric equipment
+ Control systems of the engine
+ Gear change box
- Coupling, трансмиссионная a line
   Specifications
   Coupling - the general information and check of a condition of components
   Removal, check of a condition of components and installation of the main cylinder of coupling
   Removal and installation of the executive cylinder of coupling
   Removal of air from a hydraulic path of a drive of deenergizing of coupling
   Forward power shafts - the general information
   Removal, service and installation of forward power shafts
   Removal and installation of assemblage of a rotary fist, service ступичной assemblages
   Back power shafts - the general information
   Removal, service and installation of back power shafts
   Removal, service and installation of a back nave
   Back differential - the general information
   Removal and installation карданного a shaft
   Removal and installation of a flange of a leading gear wheel of differential and epiploon
   Removal and installation of back differential
   Differential major repairs
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Автомобіль Seat Leon Cupra 2014
3df4be34

Removal and installation of a flange of a leading gear wheel of differential and epiploon

Removal

 PERFORMANCE ORDER

1. Merge from differential oil.
2. Поддомкратьте a back of the car also establish it on props.
3. Mark position карданного a shaft concerning a connecting flange.
4. Disconnect a shaft from a flange (see Has undressed Removal and installation карданного a shaft).
5. Measure and write down a twisting moment проворачивания a leading gear wheel of differential.
6. Give a fixing nut, then by means of a suitable stripper dismantle a flange.
7. Take an epiploon.


Installation

 PERFORMANCE ORDER

1. Grease sealing sponges of a new epiploon трансмиссионным with oil.
2. Plant an epiploon on the regular place.
3. Establish a connecting flange.
4. Screw a fixing nut and tighten it so to restore the twisting moment measured above проворачивания a leading gear wheel.
5. Зачеканьте a nut.
6. The further installation is made in an order, the return to an order of dismantle of components.