Subaru Forester

1997-2005 of release

Repair and car operation



Subaru Forester
+ Cars Subaru Forester
+ The maintenance instruction
+ Routine maintenance
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
+ Engine electric equipment
+ Control systems of the engine
+ Gear change box
- Coupling, трансмиссионная a line
   Specifications
   Coupling - the general information and check of a condition of components
   Removal, check of a condition of components and installation of the main cylinder of coupling
   Removal and installation of the executive cylinder of coupling
   Removal of air from a hydraulic path of a drive of deenergizing of coupling
   Forward power shafts - the general information
   Removal, service and installation of forward power shafts
   Removal and installation of assemblage of a rotary fist, service ступичной assemblages
   Back power shafts - the general information
   Removal, service and installation of back power shafts
   Removal, service and installation of a back nave
   Back differential - the general information
   Removal and installation карданного a shaft
   Removal and installation of a flange of a leading gear wheel of differential and epiploon
   Removal and installation of back differential
   Differential major repairs
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Нужна ли кузову обработка воском
3df4be34

Removal, check of a condition of components and installation of the main cylinder of coupling

Removal

 PERFORMANCE ORDER

1. By means of a syringe pump out a hydraulic liquid from the tank of the main cylinder of coupling.
2. Disconnect a hydraulic line, - for отпускания штуцерной nuts it is necessary to take advantage special накидным of a key with a cutting head, for gathering of a spilt liquid enclose under a socket rags, at once закупорьте the open end of a tube.

Do not suppose hit of a hydraulic liquid on painted кузовные the panel.

3. In case of need remove the bottom section () furnish of the left part of the panel of devices.
4. Disconnect a returnable spring, take шплинт and disconnect a cutting finger of a tip of a rod of a pusher of the main cylinder from a coupling pedal.
5. Give fixing nuts and remove assemblage of the main cylinder from a back partition of an impellent compartment.

Dismantling and check of a condition of components

Design of the main cylinder of coupling

1  — the  Cover of the tank of a hydraulic liquid
2  — the  Tank of a hydraulic liquid
3  — the  Sealing landing plug
4  — the  Pin
5  —  Assemblage of the main cylinder
6  — the  Landing flange
7  — the  Returnable spring
8  — the  Piston
9  — the  Pusher
10  — the  Lock ring of the piston

 


 PERFORMANCE ORDER

1. Take a cylindrical pin and accurately separate the tank of a hydraulic liquid from assemblage of the main cylinder.
2. Shift back duster and remove a lock ring, - try not to admit losses of such components, as a pusher rod, a washer, the piston and a returnable spring.
3. Attentively study a condition of all components of the main cylinder, checking them on presence of signs of deterioration, development of corrosion and mechanical damages. In case of need make replacement of assemblage of the cylinder.


Assemblage

Assemblage is made in an order, the return to an order of dismantle of components, - do not forget to grease contact surfaces of a pusher and the piston with silicone greasing of type № 004404003.

Installation

 PERFORMANCE ORDER

1. Installation is made upside-down. Track, that fixing nuts have been tightened with demanded effort.
2. Fill in in the tank necessary quantity of a hydraulic liquid of a demanded grade (Routine maintenance see the Head) then pump over a path, having removed from it air stoppers (see Has undressed Removal of air from a hydraulic path of a drive of deenergizing of coupling).